<turbo-stream action="append" target="news"><template>  <div class="row mb-4 py-2 news-box">
  <div class="col-12 col-md-8 col-lg-9 order-md-1 order-2">
    <div class="news-box__info-line mb-2">
        <span class="me-2 new badge text-secondary bg-gray-200">
          Neutral
        </span>
        <div class="me-2"><a class="text-gray" data-turbo-frame="_top" href="/aktien/Li-FT-Power-CA53000A1066">Li-FT Power</a></div>
        <div class="me-2 text-gray text-size-10">●</div>
        <div class="me-2 text-gray">GlobeNewsWire</div>
        <div class="me-2 text-gray text-size-10">●</div>
        <div class="me-2 text-gray">vor 4 Monaten</div>
    </div>

    <div class="mb-2">
      <a target="_blank" rel="nofollow" href="https://www.globenewswire.com/news-release/2026/06/30/3319415/0/en/LIFT-Reports-Drill-Results-from-Yellowknife-Lithium-Project-NWT.html">LIFT Reports Drill Results from Yellowknife Lithium Project, NWT</a>
    </div>

      <div class="me-0 me-md-5">
        VANCOUVER, British Columbia, June 30, 2026 (GLOBE NEWSWIRE) -- Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV: LIFT) (ASX:LFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased to report results from the 2026 winter and 2025 summer programs completed at the Yellowknife Lithium Project (“YLP”), located outside the city of Yellowknife, Northwest Territories (Figure 1).
      </div>
  </div>

  <div class="col-12 col-md-4 col-lg-3 order-md-2 order-1">
  </div>
</div>

</template></turbo-stream><turbo-stream action="replace" target="link"><template><div id="link">
    <a class="btn btn-outline-primary btn--small" data-turbo-stream="" href="/news/Li-FT-Power-CA53000A1066/load_more?page=3">
      Mehr Neuigkeiten anzeigen
      <i class="fa fa-arrow-down fa-fw"></i>
</a></div>
</template></turbo-stream>